Massachusetts Water Resources Authority Advisory Board’s letter to Massachusetts Department of Environmental Protection, dated 04/22/2024
Water Quality Variance Letter. Here, the MWRA asks that not a single dollar be spent on the Alewife or Charles River and that the the timeline for planning the new CSO Control Plan be pushed far into the future because it is “unnecessary”.

File Type: pdf
File Size: 255 KB