This is Cambridge’s Alewife Development Planning document from 1979. The MBTA’s Alewife T stop was not yet constructed, but the design of it is included here. There is a section on flooding, but not on water quality.

File Type: pdf
File Size: 6 MB
Categories: Cambridge, Flooding, Historical