This court document shows that Cambridge voluntarily agreed to take financial responsibility for CSO projects. This indicates they were not required to do so.

Cambridge wanted sewer separation and the stormwater wetland and other GSI. And Cambridge chose to contribute some funding in exchange for having control over work that was done. In return, MWRA agreed to increase funding for the projects.

File Type: pdf
File Size: 1 MB