Tonight. September 25th at 6 PM via Zoom
Massachusetts Water Resources Authority is expected to say that eliminating sewage pollution will not improve water quality. Nonsense.
Our strategy is simple.
- Register for the meeting now!
- Login to the meeting tonight at 6 pm.
- Make your voice heard, if the meeting presenters allow it.
Please use the chat feature during the meeting – if the presenters allow it.
Raise your hand to speak during Q&A.
- Tell a personal story if you have one. Explain why ending sewage pollution is important to you, if you have kids, live, walk, or bike along Alewife Brook.
- Demand an End to Sewage Pollution by 2050.
Ask MWRA for a plan that includes:
1. Complete Sewer Separation by 2050.
2. Green Stormwater Infrastructure to reduce flooding and clean the water.
3. Underground Sewage Storage Tanks.
4. Most importantly: A 25-year level of control for the year 2050*
* A 25-year level of control is what engineers often refer to as “virtual” combined sewage elimination. It means that there are no sewage discharges, except in a really big storm that occurs roughly every 25 years. Today’s “25-year storm” has a 4% chance of occurring in any given year, statistically expected once every 25 years. That means around 6 inches of rain in 24-hours, according to the most current rainfall model (NOAA Atlas 14).
Ending Sewage Pollution at Alewife Brook means
MWRA MUST PAY ITS FAIR SHARE!
Please attend tonight.
Thursday, September 25th at 6 PM via Zoom